Every construction site in the UK is subject to the Construction (Design and Management) Regulations 2015 (CDM 2015). Schedule 2 governs welfare facilities: toilets, washbasins, drinking water, changing rooms, and rest areas. For main contractors and subcontractors, this is not a reference document but a basis for HSE (Health and Safety Executive — the UK occupational safety authority) inspections and for worker site access through RAMS (Risk Assessment and Method Statement) and the construction phase plan. Non-compliance with Schedule 2 may result in a notice of violation or a work prohibition — effectively halting construction. Below is what is inspected and which points are covered by the waterless urinal.

What CDM 2015 Schedule 2 Requires

Clause 1 of Schedule 2 mandates the provision of "sufficient suitable toilets" in accessible proximity to work areas — with ventilation, lighting, and the ability for hygienic cleaning. The approved HSE Code of Practice L153 and industry guidance HSG150 specify practical calculations: one toilet and one urinal per 7 male workers on sites with up to 50 people, then decreasing proportionally. Clause 2 requires washbasins (sink with hot and cold water, soap, towels) near the toilets.

On sites without water and sewage connections, these requirements are met by mobile toilet cabins with holding tanks — a standard from Andy Loos, Loos for Do's, Site Equip, Plant-i.

Calculating Urinals and Toilets for a Crew

On UK construction sites with a predominance of men — earthworks, steel structure installation, facade work, primary installation of engineering systems — it is permissible to replace some toilets with urinals within the overall HSG150 calculation. One urinal per 15–20 male workers is typical practice on medium and large sites. This reduces queues for the single cabin during peak times (shift start, lunch break). Pi-Pi is mounted on the wall of an existing toilet cabin or inside a welfare module without plumbing alterations: the stepped outlet Ø24/32/40 mm connects to a standard holding tank from any UK cabin manufacturer.

RAMS, Construction Phase Plan, and HSE Inspection

The construction phase plan, which the main contractor prepares before work begins, and the subcontractor's RAMS include a section on welfare facilities. The standard package from Pi-Pi: LLDPE technical specification, REACH and UK REACH compliance confirmation, photo of the installed urinal, connection diagram. This is sufficient for the phase plan, RAMS, and HSE inspection. Documents are sent via email.

Winter Operation in the UK

Winter in the UK is milder than continental Europe, but occasional frosts of −5 °C…−10 °C are common in Scotland, Northumberland, North Yorkshire, and the Pennines. Polypropylene in budget urinals becomes brittle at −10 °C — this is not a defect but a material property. LLDPE Pi-Pi remains flexible down to −30 °C (per ASTM D1693). For UK rental companies, this means the urinal will survive winter in storage and five transport cycles, not just two.

Compatibility with Andy Loos, Loos for Do's, Site Equip

The UK mobile toilet rental market is fragmented among Andy Loos (national network), Loos for Do's (events), Site Equip (construction focus), and dozens of regional companies — from Scotland to Cornwall. All use holding tanks with 32 or 40 mm inlets. Pi-Pi's stepped outlet (24/32/40) connects without adapters. For a mixed rental fleet, this is one item for the entire fleet.

Brexit and Customs

Pi-Pi (Estonia) is an EU-origin product, exported to the UK through a standard customs declaration. Delivery takes 7–10 working days via a customs broker. VAT is processed according to UK commercial import rules (zero rate when shipped from the EU, import VAT upon border crossing, reclaimable through quarterly VAT returns for registered companies). For project orders of 100 units or more, consolidated shipping to a UK warehouse is possible.

What the Urinal Does Not Do

Pi-Pi is a component, not a complete solution for Schedule 2. The regulation requires a toilet, washbasins, hot and cold water, hand drying facilities. Pi-Pi covers one point — separate collection of male urine standing.

Conclusion

CDM 2015 Schedule 2 is the framework within which every UK construction site operates. Pi-Pi is tailored to this framework: the material does not crack in Highland winters and does not degrade from UV in southern counties, the outlet is compatible with the fleets of Andy Loos, Loos for Do's, and Site Equip, and documents are ready for the phase plan, RAMS, and HSE. Installation takes 15–30 minutes. For calculations specific to your site and bulk pricing from 100 units, email us — we will send a calculator and supply terms.

Pi-Pi Waterless Urinals

Pi-Pi Standard

Pi-Pi Standard

Simple one-piece body without a top opening. Suitable for ventilated toilet cabins, site huts, and sanitary modules.

Volume pricing from 10 units

Learn More
Pi-Pi Standard Plus

Pi-Pi Standard Plus

There is a Ø70 mm opening at the top, to which an exhaust or water rinsing hose can be connected. Used for enclosed toilet cabins, sanitary containers, and site huts where ventilation is essential.

Volume pricing from 10 units

Learn More

Have Questions?

Contact us — let's discuss terms, calculate costs, and find the right configuration. I respond within one business day.

Mart Tamm

Mart Tamm

Account Manager for Estonia

Have questions about products, pricing, or partnership? Email me directly — I'll respond personally.